Why Early coordination with landlords matters

img 1951 scaled (1)

Why Early Coordination With Landlords Matters in Tenant Improvement Projects

Tenant improvement projects are a common part of commercial construction, especially in office, retail, and mixed use buildings. While many tenants focus on design and budgeting, one critical factor often underestimated is early coordination with the landlord.

Landlords play a direct role in approvals, access, utilities, and scheduling. When coordination starts late, even well planned projects can face delays, redesigns, and unexpected costs. Understanding why landlord involvement matters from the beginning helps tenants protect both timeline and budget.

The Landlord Role in Tenant Improvement Projects

In most commercial leases, the landlord maintains control over base building systems and common areas. This includes structural elements, roof systems, fire protection, utility capacity, and exterior modifications.

Because of this oversight, landlords typically require review and approval of tenant plans before construction can begin. These reviews are not informal. They often involve property management teams, engineers, and third party consultants who evaluate how proposed work affects the building as a whole.

Work Letters and Lease Requirements

Many tenant improvement projects are governed by a work letter attached to the lease. This document outlines what construction is permitted, what approvals are required, and which responsibilities belong to the tenant versus the landlord.

Work letters often define allowable materials, ceiling heights, utility tie in points, and construction hours. Ignoring or misinterpreting these requirements can lead to rejected plans or required revisions later in the process.

Early coordination allows the project team to align design decisions with lease obligations before drawings advance too far.

Approval Timelines Can Impact the Schedule

Landlord approvals rarely happen overnight. Reviews may take several weeks and often require revisions before final sign off is granted.

If approvals are not built into the project schedule, construction start dates can slip. This is especially problematic for tenants working toward fixed move in dates or lease commencement deadlines.

By engaging the landlord early, teams can understand review timelines and sequence design submissions accordingly.

Base Building System Constraints

Tenant improvements frequently rely on existing base building systems. Electrical capacity, mechanical distribution, plumbing routes, and fire protection layouts are not always flexible.

Without early coordination, tenants may design layouts that exceed available capacity or conflict with existing systems. Resolving these issues later can require redesign, additional engineering, or costly upgrades.

Early landlord involvement helps confirm what the building can support and where limitations exist.

Access and Construction Restrictions

Many occupied buildings have strict rules regarding access, noise, and working hours. Elevators, loading docks, and shared corridors are often managed by property operations teams.

If construction logistics are not discussed early, contractors may face limited access that slows progress. Night or weekend work may be required, which can affect cost and schedule.

Clear expectations upfront allow contractors to plan realistic workflows and avoid disruptions to other tenants.

Utility Coordination and Shut Downs

Tenant improvement projects sometimes require temporary utility shut downs or tie ins to existing systems. These activities almost always require landlord approval and coordination with building management.

Scheduling shut downs late in the process can cause delays if approvals are not in place or if other tenants are affected. Early coordination helps identify required approvals and plan shut downs at appropriate times.

The Role of the General Contractor

An experienced commercial general contractor understands the importance of landlord coordination and incorporates it into preconstruction planning.

This includes reviewing lease documents, communicating with property management, and aligning construction plans with building requirements. Proactive coordination helps prevent surprises and keeps projects moving forward.

What Tenants Can Do to Support Successful Coordination

Tenants can improve outcomes by sharing lease documents early, making timely decisions, and understanding that landlord requirements are a standard part of tenant improvement work.

Selecting a contractor familiar with occupied buildings and landlord processes can significantly reduce risk.

Final Thoughts

Tenant improvement projects do not exist in isolation. They operate within existing buildings that serve multiple occupants, systems, and stakeholders.

Early coordination with landlords helps align expectations, protect schedules, and avoid costly revisions. By treating landlord involvement as a core part of project planning, tenants can deliver smoother and more predictable construction outcomes.